Bored Piles.

About Bored Piles

Bored piling is the most widely used piling method in New South Wales Australia, and is one of APG’s core specialitiesy. Using rotary drill rigs, material is extracted in controlled increments to create an open bore, which is then reinforced and poured with concrete in place. The method is suited to ground conditions where the bore will hold itself open remain open unsupported. Typically good clays, low-strength rock, or hard rock requiring deep embedment. It’s the preferred method for government and infrastructure projects due to its ability to allow full visual inspection of the base and pile parameters during installation.

WHY CHOOSE APG FOR BORED PILING 

NSW’s Most Common Method and Our Core Speciality
Bored piling is the dominant method across NSW and Sydney. It’s what we do every day, across every project type, including residential, commercial, infrastructure and government.
ransport for NSW and other government specs frequently require bored piling because it allows visual inspection of the base and parameters. Something CFA and other piling methods can’t offer.
300mm to 3,000mm diameter. Depths to 75m. Rock strengths to 200 MPa. Our fleet and tooling cover the full spectrum of bored piling requirements.
Every rig in the APG fleet is under five years old. We retire ageing rigs and replace them with new equipment, less downtime and more reliability on every site.
90% of our fleet is under five years old. We retire ageing rigs and replace them with new equipment. Less downtime means more reliability on every site.

WHY CHOOSE APG FOR BORED PILING 

NSW’s Most Common Method and Our Core Speciality
Bored piling is the dominant method across NSW and Sydney. It’s what we do every day, across every project type, including residential, commercial, infrastructure and government.
ransport for NSW and other government specs frequently require bored piling because it allows visual inspection of the base and parameters. Something CFA and other piling methods can’t offer.
300mm to 3,000mm diameter. Depths to 75m. Rock strengths to 200 MPa. Our fleet and tooling cover the full spectrum of bored piling requirements.
Every rig in the APG fleet is under five years old. We retire ageing rigs and replace them with new equipment, less downtime and more reliability on every site.
90% of our fleet is under five years old. We retire ageing rigs and replace them with new equipment. Less downtime means more reliability on every site.

PRIMARY APPLICATIONS & USE CASES

Deep Stratum Requirements (up to 75m depth)

Where projects demand deep embedment into rock, high-rise foundations, bridges, and major infrastructure, bored piling delivers the reach and load capacity required.  

With rigs capable of applying significant downforce and torque, APG can core through rock strengths up to 200 MPa, classified as extremely high-strength rock in geotech reporting. 

From small residential footings to 3,000mm-diameter foundation piles for major structures, our fleet covers the full range of diameters.  

Where poor material sits above good rock, temporary casings can stabilise the upper section. At the same time, the bore continues through to the required toe, keeping bored piling viable across a wider range of sites.  

5 min read