Blacktown Project | Bored Piling

APG delivered bored piling for N. Moit & Sons at George Street, Blacktown.
Bored Piles
Live Traffic & Constrained Work Areas
Works are being undertaken within busy construction zones alongside live roads and active infrastructure interfaces. APG implemented detailed traffic management, structured work staging and constant coordination with adjacent contractors to maintain the programme without compromising the surrounding road network.
Significant portions of the work are being completed during night shifts to accommodate project staging and minimise disruption to surrounding road networks. Maintaining safety standards, quality controls, and productivity during night operations required experienced crews, specialised site lighting, and tightly managed access protocols.
A key technical challenge involved installing reinforcement cage couplers at extremely precise positions so they align flush with future base slab connections once excavation is complete. APG implemented strict survey controls, dedicated QA processes, and experienced installation crews to consistently achieve the required tolerances.
Delivering piling concurrently across three major project sections required significant resource planning, fleet management, and coordination across multiple active work fronts. APG deployed multiple 120+ tonne piling rigs alongside support cranes, concrete pumps, and experienced crews, working simultaneously across the STSP, NTNP, and Central Section packages.

On-Site: Blacktown

Project Track Record

Kemps Creek, NSW

Kemps Creek Warehouse | Multi-Level Distribution Facility Foundations

  • Kemps Creek Warehouse | Multi-Level Distribution Facility Foundations
  • Kemps Creek, NSW

Azzuri Concrete contracted Australian Piling Group (APG) to construct the foundation piles for a major new warehouse and distribution facili...

Key Challenge

High-Capacity Foundations For Multi-Level Loading, Delivery Across A Large Site Footprint

9-15 George Street, Burwood NSW

APG X MOITS Burwood Project

  • APG X MOITS Burwood Project
  • 9-15 George Street, Burwood NSW

Australian Piling Group (APG) worked alongside N.Moit & Sons to deliver the shoring piles for a four-level basement excavation at George Str...

Key Challenge

Piling Below Adjacent Basements On A Constrained Site

Brookvale Oval Redevelopment, NSW

Brookvale Oval Centre Of Excellence & Grandstand Foundations

  • Brookvale Oval Centre Of Excellence & Grandstand Foundations
  • Brookvale Oval Redevelopment, NSW

Australian Piling Group (APG) partnered with ADCO Constructions to deliver the foundation piling for the redevelopment of Brookvale Oval, th...

Key Challenge

Ground Conditions at Depth

3 min read