Australia Piling Group (APG) delivered the foundation piling for ADCO Constructions on the $55 million refurbishment of the Waves Aquatic Centre at Baulkham Hills, a major community facility. The centre features a FINA-standard 10-lane Olympic pool, a combined 25-metre learn-to-swim and leisure pool, a swimming clubhouse, and a gym and fitness centre.
APG took the foundation scope as a design-and-construct package, supporting the facility on over 450 piles.